Assembly of valves

Classification:

Release Time:2018-12-04

(1) the preparatory work before assembly: valve parts in the assembly before the need to remove the burr and welding residual welding slag, cleaning and cutting packing and gasket. (2) cleaning of valve parts: as a fluid pipeline to control the installation of the valve, the cavity must be clean. Clean the valve parts before assembly, and remove the chips, residual smooth oil, coolant and burrs, welding slag and other dirt on the parts. After grinding and polishing, the parts need to be cleaned finally. The final cleaning is usually to brush the sealing surface with gasoline, then blow dry with tight air and wipe clean with cloth. (3) Packing and gasket preparation: graphite

(1) the preparatory work before assembly: valve parts in the assembly before the need to remove the burr and welding residual welding slag, cleaning and cutting packing and gasket.

(2) cleaning of valve parts: as a fluid pipeline to control the installation of the valve, the cavity must be clean. Clean the valve parts before assembly, and remove the chips, residual smooth oil, coolant and burrs, welding slag and other dirt on the parts. After grinding and polishing, the parts need to be cleaned finally. The final cleaning is usually to brush the sealing surface with gasoline, then blow dry with tight air and wipe clean with cloth.

(3) packing and gasket preparation: graphite packing due to the existence of corrosion resistance, good sealing and small coefficient of friction and other advantages, has been widely used. Packing and gaskets are used to prevent leakage of media through the stem and bonnet and between the flange joint faces. These accessories should be prepared for cutting and collecting before valve assembly.

(4) the valve assembly: the valve is usually the valve body as the reference parts according to the process of the order and method of assembly. Before assembly, parts and components shall be reviewed to avoid parts that have not been deburred and cleaned from entering the final assembly. During the assembly process, the parts should be handled with care to avoid bumping and scratching the processing personnel. Bonnet and valve body in the French to use bolts, fastening bolts, otherwise the joint surface of the valve body, valve cover will be due to uneven force around the flow control valve leakage. Fastening the use of hand should not be too long, to prevent the pre-tightening force is too large and affect the strength of the bolt. For valves with strict requirements for pre-tightening force, the torque handle shall be applied to tighten the bolts according to the specified torque requirements. After the final assembly is realized, the holding mechanism should be rotated to check whether the movement of the valve opening and closing parts is mobile and whether there is any jam. Whether the device direction of the valve cover, bracket and other parts of the pressure reducing valve meets the requirements of the drawing, and the valve can only be tested after passing all the tests.

WeChat Public Number
Mobile phone official website
WeChat Public Number

Contact Information

+86 27-8970 8339

Tel: +86 27-8970 8619

WhatsApp: +86 181 7126 2929

E-mail: whylgd@vip.163.com

Address: No.5, Zhengjie, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province