1. The main materials, equipment and products used in the construction are lack of technical quality appraisal documents or product certificates that meet the current standards issued by the state or the ministry. 2. The necessary quality inspection is not carried out before the valve is installed. Measures: before the valve installation, should do compressive strength and tightness test. 3. The specifications and models of the installed valves do not meet the design requirements. Measures: familiar with the scope of application of various types of valves, according to the design requirements of the selection of valve specifications and models. 4. The valve installation method is wrong. Measures: strictly according to the valve installation instructions for installation, open stem gate valve to keep full stem extension opening height, butterfly valve fully tested

1. The main materials, equipment and products used in the construction are lack of technical quality appraisal documents or product certificates that meet the current standards issued by the state or the ministry.

2. The necessary quality inspection is not carried out before the valve is installed. Measures: before the valve installation, should do compressive strength and tightness test.

3. The specifications and models of the installed valves do not meet the design requirements. Measures: familiar with the scope of application of various types of valves, according to the design requirements of the selection of valve specifications and models.

4. The valve installation method is wrong. Measures: Install in strict accordance with the valve installation instructions. The open-stem gate valve shall keep the extended opening height of the stem. The butterfly valve shall fully consider the rotation space of the handle. The various valve rods shall not be lower than the horizontal position, let alone downward. The concealed valve shall not only be provided with an inspection door to meet the opening and closing requirements of the valve, but also the valve stem shall face the inspection door.

5, butterfly valve flange with ordinary valve flange. Measures: according to the actual size of the butterfly valve flange processing flange.

6, pipeline welding, butt after the pipe wrong mouth is not on a center line, the butt does not leave a gap, thick wall pipe does not shovel groove, weld width, height does not meet the requirements of construction specifications. Measures: After welding the pipes to each other, the pipes should not be at the wrong end. They should be on a central line, leaving a gap between the pipes. Thick-walled pipes should be shoveled with grooves. In addition, the width and height of the weld should be welded according to the specification requirements.

7. During the hydraulic strength test and tightness test of the pipeline system, only the pressure value and water level change are observed, and the leakage check is not enough. Measures: when the pipeline system is tested according to the design requirements and construction specifications, in addition to recording the pressure value or water level change within the specified time, it is necessary to carefully check whether there is leakage problem.

8. Sewage, rainwater and condensate pipes shall be concealed without closed water test. Measures: The closed water test shall be checked and accepted strictly according to the specifications.

9. The pipeline system is not washed carefully before completion, and the flow rate and speed cannot meet the pipeline washing requirements. Even water pressure strength test drainage instead of flushing. Measures: Use the maximum juice flow rate in the system or should not be less3m/sThe water flow rate is flushed. The color and transparency of the outlet water shall be visually consistent with that of the inlet water.

10, winter construction in the negative temperature of the hydraulic test. Measures: as far as possible before the winter water pressure test, and after the pressure test to blow the water, especially the water in the valve must be removed in the net, otherwise the valve will freeze crack.

WeChat Public Number
Mobile phone official website
WeChat Public Number

Contact Information

+86 27-8970 8339

Tel: +86 27-8970 8619

WhatsApp: +86 181 7126 2929

E-mail: whylgd@vip.163.com

Address: No.5, Zhengjie, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province