What are the anti-freezing protection measures of the trap

Classification:

Release Time:2018-05-03

Selection, installation of the appropriate trap as long as there is steam through, there will be no freezing problems. However, if the steam is cut off, the steam condensate will form a vacuum in the heat exchanger or the accompanying pipe. This prevents condensation from freely draining out of the system before freezing occurs. Therefore, a vacuum breaker should be installed between the discharge equipment and the trap. If gravity discharge is not used from the trap to the return pipe, the trap and discharge pipeline should be discharged manually or automatically using a discharge pipe with antifreeze measures. Also, when multiple traps are installed together in the trap station, the trap insulation can prevent freezing. Anti-

Selection, installation of the appropriate trap as long as there is steam through, there will be no freezing problems. However, if the steam is cut off, the steam condensate will form a vacuum in the heat exchanger or the accompanying pipe. This prevents condensation from freely draining out of the system before freezing occurs. Therefore, a vacuum breaker should be installed between the discharge equipment and the trap. If gravity discharge is not used from the trap to the return pipe, the trap and discharge pipeline should be discharged manually or automatically using a discharge pipe with antifreeze measures. Also, when multiple traps are installed together in the trap station, the trap insulation can prevent freezing.

Anti-freezing measures are:

1. Trap do not choose the size is too large.

2. Keep the drain line as short as possible.

3. Tilt the drain valve discharge pipeline downward to speed up the gravity discharge.

4. Heat insulation shall be added for drain valve discharge pipeline and condensate return pipeline.

5. When the condensate water return pipeline is exposed to atmospheric conditions, heat tracing pipes should be considered.

6. If the return pipe rises, the vertical discharge pipe should be adjacent to the discharge pipe on the upper part of the return header, and the discharge pipe and the trap discharge pipe should be insulated together.

WeChat Public Number
Mobile phone official website
WeChat Public Number

Contact Information

+86 27-8970 8339

Tel: +86 27-8970 8619

WhatsApp: +86 181 7126 2929

E-mail: whylgd@vip.163.com

Address: No.5, Zhengjie, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province