Check valve installation attention points and selection

Classification:

Release Time:2021-05-21

Check valve installation note points: 1, because the check valve is easy to damage, therefore, should be installed near the pump outlet check valve, in the upper part of the check valve with a cut-off valve (usually with ball valve or gate valve), easy maintenance. 2. The check valve medium on the standpipe flows from bottom to top. 3. When installing, pay attention to the direction of medium flow should be consistent with the arrow direction of the valve body.

Check valve installation note points:

 

1, because the check valve is easy to damage, therefore, should be installed near the pump outlet check valve, in the upper part of the check valve with a cut-off valve (usually with ball valve or gate valve), easy maintenance.
2. The check valve medium on the standpipe flows from bottom to top.
3. When installing, pay attention to the direction of medium flow should be consistent with the arrow direction of the valve body.

 

Check valve according to the nominal diameter selection:

 

For high and medium pressure check valves with DN<50, vertical lifting check valve and straight-through lifting check valve should be selected;
For low-pressure check valves with DN<50, butterfly check valves, vertical lift check valves and diaphragm check valves should be selected;
For 50For 200For 50For pipelines with relatively small water hammer impact or no water hammer when required to be closed, slow-closing swing check valve and slow-closing butterfly check valve should be selected.

WeChat Public Number
Mobile phone official website
WeChat Public Number

Contact Information

+86 27-8970 8339

Tel: +86 27-8970 8619

WhatsApp: +86 181 7126 2929

E-mail: whylgd@vip.163.com

Address: No.5, Zhengjie, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province